In Draper, Utah, 1GC ran Cat 6 through a bank of office cubicles, terminated the workstation jacks, installed the faceplates, and tested the cabling. Once the partitions were closed, someone sitting at a desk would see just a numbered data jack beside the power outlets. The installation photos show the route behind it.
Following the cable through the partitions
The open frames gave our crew access to the lower channel between workstations. We routed the bundle around the corner and brought individual cables out through the openings for the workstation plates.
The cable reaches the workstation through the opening for the faceplate.The open panel exposes the path between workstations.
Terminating, labeling, and testing the jacks
At the workstation, we terminated the cable on a jack, fitted the faceplate, and tested the connection. A label such as J-3 gives the office a specific outlet to identify when a desk moves or a technician needs to trace the line.
The cable end at the workstation before termination.A finished workstation connection with its jack and faceplate installed.
In Sandy, Utah, our crew pulled roughly ten boxes of Cat 6 cable for a structured cabling and OS2 single-mode fiber installation. The finished wall plates show only the last few inches of that work. The installation photos show where the rest of the cable went.
Pulling Cat 6 through the office
With the ceiling open, we pulled the copper runs overhead between the outlet locations and the network rack. At the room end, a single faceplate could bring six runs together. At the rack, the cables from those outlets came together in bundles before we terminated them on the patch panels. The two views below show the same stage of work from opposite ends of the route.
Above the office, the open ceiling shows the path the crew used for the cable pull.At the network rack, the incoming runs are visible before final patching.
From open framing to labeled data outlets
Before the wall was closed, the metal studs, conduit and outlet box were accessible. At the room end, the crew terminated the cables on individual jacks. One finished six-port plate carries the label J1–6. That gives someone reporting a connection problem a specific outlet to identify.
The outlet location during rough-in.Six data connections share one labeled faceplate.
Copper patching and the fiber uplink
In the rack, patch panels bring the copper runs together. Short patch cords link those terminations to switch ports. The yellow fiber lead connects at the switch uplink. A separate field photo shows visible light at a fiber connection during a check of the optical path.
The fiber connection at the switch.Checking the fiber path during the Sandy installation.
The rack during patching.The finished rack, with the copper and fiber connections in place.
At Gateway Pines in Pleasant Grove, Utah, a carrier serving a new tenant needs a way to reach that tenant’s suite. 1GC connected the two buildings with OS2 single-mode fiber and ran fiber to the network closet in every suite. We built the route with conduit, roughly 700 feet of orange corrugated innerduct, and two equipment racks.
Building the pathway between buildings
The route had two layers. The larger conduit formed the passage between buildings. Inside it, corrugated innerduct gave the OS2 fiber its own protected channel. The flexible tubing arrived on a spool so the crew could feed it into the route from an access point. The approximately 700-foot figure describes the innerduct we installed across the job.
At the open handhole, the crew fed orange tubing from a spool into the conduit.A length of innerduct laid out beside the building shows how the flexible tubing handles changes in direction.
Inside the handhole
The handhole is an access box in the ground. With its cover lifted, the conduit opening and the smaller orange ducts are visible together. From the surface, the crew could reach this junction while working on the pathway. Once the cover is back in place, very little of this part of the installation is visible.
The crew worked at the handhole opening with the innerduct within reach.Looking down into the box, the orange tubing is visible at the mouth of the gray conduit.
Bringing the pathway indoors
At the building entrance, the work shifted from feeding duct outside to bringing it up the interior wall. In the first photo below, a technician works at floor level. In the next, the orange bends are visible below a wall-mounted rack. Together the views show the transition that a finished rack photograph alone would miss.
Working the innerduct at the building entrance.The exposed bends show where the fiber pathway meets the equipment location.
Two racks and the fiber connections
A carrier can install its equipment in a rack and patch directly to the fiber serving an individual suite. At the far end, the fiber reaches the suite’s intermediate distribution frame (IDF), the location where the tenant’s network connects. This gives the carrier an existing path to the customer when it is time to turn up service.
Across the two panels, the crew installed approximately 36 LC connectors, with about 24 on one panel and 12 on the other. The close-up below shows the patch connections a technician works with when connecting a suite.
The finished Gateway Pines rack has room for carrier equipment above the LC patch panel. Orange innerduct rises from the conduit below.The fiber panel brings individual connections together at the rack.
At a warehouse in West Valley City, Utah, 1GC extended a fiber circuit from the carrier’s handoff to the equipment it needed to serve. The job combined three kinds of work: reaching the cable route, splicing the fiber, and installing the equipment at the far end.
Reaching the route inside and outside
The carrier handoff, sometimes called the demarc, is where the provider delivers the circuit. A warehouse can have plenty of space between that point and the equipment that needs the connection. Here, the crew used a scissor lift alongside the exterior wall and worked overhead inside the warehouse. The aisle view shows the cable laid out between rows of shelving.
The raised platform gave the crew access to the upper exterior wall.Inside the warehouse, the lift reached the exposed ceiling above the shelving.
Cable laid out along the warehouse aisle during installation.At the network closet, the cable pathways reach the wall-mounted equipment.
A technician runs outdoor fiber from the warehouse network closet to the carrier handoff.
Splicing the fiber and connecting the equipment
Extending the circuit required joining the optical fibers. A fusion splicer aligns the prepared fiber ends and joins them to form a continuous optical path. At the equipment end, patch leads connect that path to the network hardware. These two close-ups show the splice work and the connections a technician can access afterward.
The fusion splicer’s display and controls during the West Valley City job.Fiber patch leads connected to the installed network equipment.