In Draper, Utah, 1GC ran Cat 6 through a bank of office cubicles, terminated the workstation jacks, installed the faceplates, and tested the cabling. Once the partitions were closed, someone sitting at a desk would see just a numbered data jack beside the power outlets. The installation photos show the route behind it.
Following the cable through the partitions
The open frames gave our crew access to the lower channel between workstations. We routed the bundle around the corner and brought individual cables out through the openings for the workstation plates.


Terminating, labeling, and testing the jacks
At the workstation, we terminated the cable on a jack, fitted the faceplate, and tested the connection. A label such as J-3 gives the office a specific outlet to identify when a desk moves or a technician needs to trace the line.