In Sandy, Utah, our crew pulled roughly ten boxes of Cat 6 cable for a structured cabling and OS2 single-mode fiber installation. The finished wall plates show only the last few inches of that work. The installation photos show where the rest of the cable went.
Pulling Cat 6 through the office
With the ceiling open, we pulled the copper runs overhead between the outlet locations and the network rack. At the room end, a single faceplate could bring six runs together. At the rack, the cables from those outlets came together in bundles before we terminated them on the patch panels. The two views below show the same stage of work from opposite ends of the route.


From open framing to labeled data outlets
Before the wall was closed, the metal studs, conduit and outlet box were accessible. At the room end, the crew terminated the cables on individual jacks. One finished six-port plate carries the label J1–6. That gives someone reporting a connection problem a specific outlet to identify.


Copper patching and the fiber uplink
In the rack, patch panels bring the copper runs together. Short patch cords link those terminations to switch ports. The yellow fiber lead connects at the switch uplink. A separate field photo shows visible light at a fiber connection during a check of the optical path.