Wiring office cubicles with Cat 6 in Draper, Utah

In Draper, Utah, 1GC ran Cat 6 through a bank of office cubicles, terminated the workstation jacks, installed the faceplates, and tested the cabling. Once the partitions were closed, someone sitting at a desk would see just a numbered data jack beside the power outlets. The installation photos show the route behind it.

Following the cable through the partitions

The open frames gave our crew access to the lower channel between workstations. We routed the bundle around the corner and brought individual cables out through the openings for the workstation plates.

White cable emerging from the faceplate opening at the base of a Draper workstation partition
The cable reaches the workstation through the opening for the faceplate.
Open cubicle frame with cables along the lower channel
The open panel exposes the path between workstations.

Terminating, labeling, and testing the jacks

At the workstation, we terminated the cable on a jack, fitted the faceplate, and tested the connection. A label such as J-3 gives the office a specific outlet to identify when a desk moves or a technician needs to trace the line.

Loose data cable at a cubicle outlet strip
The cable end at the workstation before termination.
Finished data jack labeled J-3 beside a power outlet
A finished workstation connection with its jack and faceplate installed.

Explore our structured cabling services, see other Wasatch Front projects, or request a site survey.