1GC helps you run virtual machines where they make sense for your business: on your own servers, in 1GC’s cloud, or with a public cloud provider such as Amazon Web Services (AWS). We start with the applications you rely on, the infrastructure you already own, and how quickly you need to recover after an interruption. Different workloads can call for different choices.
Where should the workload run?
On your site. Keeping a VM close to the people or equipment that use it can be valuable when local access matters. We help plan host capacity, storage, maintenance and recovery if the site becomes unavailable.
In 1GC’s cloud. Hosting with us is an option when you want to move server infrastructure out of your building. We work through sizing, connectivity from each office and recovery requirements with you.
In a public cloud. If you already use AWS or another provider, we can help you plan and support VMs there. We review workload size, connectivity, storage and ongoing costs in the context of that environment.
Backups you can restore
Across all three environments, we help you decide what needs backing up, how often to capture it and where to keep a separate recovery copy. A snapshot can help undo a recent change. An independent backup gives you another recovery path if the primary storage is lost. A test restore checks whether the application starts, its dependencies are available and the recovered data is recent enough for your business.
A virtual machine runs your operating system and applications on a host with allocated processor capacity and memory. Its virtual disks hold the operating system, application files and data. Planning the host and its storage together lets us size them for the same workload.
Moving a running workload
For planned maintenance, compatible hosts can support live migration. Before a move, we review the target host’s capacity, network reachability and access to current disk data. An unplanned outage calls for a different procedure: starting the workload on an available host using a recoverable copy of its disks.
What to plan for recovery
Which application needs to start first? How much recent work could the business afford to lose? Those answers guide replication frequency, recovery capacity and the tests needed to confirm the application is usable again.
Related services
Two data centers, two recovery paths
Example architecture: each site has compute capacity and storage. A link between sites carries replication traffic.
Site A · production
The application runs on Host A and writes to its virtual disk. Changes are copied to Site B at the configured interval.
Site B · recovery
Host B has access to a replica of the virtual disk. Recovery also requires enough compute capacity, network access and any application dependencies.
During planned maintenance, a compatible destination and a working migration path can let the VM move while running. After a site outage, the recovery host starts the VM from the latest usable copy. Writes since the last replication may need to be recovered separately.