Even a small renovation can start with an outdated floor plan. A wall may have moved, an equipment room may serve a different purpose, or the drawings may never have shown the route between buildings. At 1GC, preparing a site plan is part of every project. We use it to show existing conditions, identify what will change and give the crew and estimator a common reference.

That is why we handle drafting and material takeoffs together. When a route changes on the plan, we can trace exactly which cable lengths, conduit runs and device counts need to change with it.

Plans and drafting

We start with available drawings and field information, then organize the plan so someone arriving on site can find the work. On a camera and wireless access point layout, for example, we number each device, mark its mounting location and show the cable route back to the equipment room. A crew member can find the same number on the plan and the takeoff.

We identify dimensions that still need field verification and record the installation requirements that apply to the job. Clear symbols, labels and revision dates help the superintendent and installers check the work against the current drawings, project specifications and applicable standards.

1GC draft concept

RR 2 floor plan callout and two enlarged restroom plans showing fixtures and door swings
1GC design plans

Material takeoffs

A takeoff turns the scope shown on a set of plans into measurable quantities. For a datacom project, that might mean counting devices by floor, measuring cable runs by route and separating conduit by size. Drawing revisions, assumptions and exclusions give the estimator a basis for checking the quantities before pricing or ordering.

Example takeoff from the two restroom details
Item shownPer restroomBoth restrooms
Water closets24
Lavatories24

Discuss your drawings

Tell us what you’re building, which trades you need covered and when you need the drawings or quantities. Include the current plan revision if you have one.

Discuss your project with 1GC