In 2025, 1GC brought a dedicated internet circuit into U.S. Senator John Barrasso’s office in Riverton, Wyoming, and connected the network that served its workstations and IP phones. Dylan Finch, 1GC’s general contractor and senior network engineer, personally led and installed the project.
Finding a path through the attic
Getting Cat 6 from the equipment closet to the offices meant working above finished rooms. Dylan climbed through a hallway ceiling hatch, crawled between the roof trusses and drilled access for the cable drops. Loose-fill insulation covered the attic floor. Each run had to reach the correct wall opening below.




From the cable drop to the wall jack
Dylan ran the wiring through the attic and down to the work areas, terminated the Cat 6 at the jacks, and installed the faceplates. At the other end, the runs came together at the equipment rack.


Connecting and testing the network
The installation included the building entrance for dedicated internet access, a wall-mounted rack, a switch and a router. Dylan patched the cabling, tested the runs, and brought the network and IP phones into service.