At Davis Conference Center in Layton, Utah, replacing the aging Ruckus Wi-Fi system meant following each connection back from the conference floor. A new access point needed a cable to a network closet. Each closet needed a fast path back to the core. 1GC handled that entire path, from pulling fiber and copper cable to configuring the switches, routers, and wireless network.
Connecting the network closets
We ran OS2 single-mode fiber between the network closets and the core, giving the venue a backbone with 25-gigabit uplinks. The fiber also gives Davis room to increase capacity in the future as equipment and traffic needs change. From the closets, our crew pulled new Cat 6A runs to serve the wireless installation.

Putting 45 access points into service
Our crew installed 45 access points and replaced the venue’s switches and routers. We configured VLANs to keep different types of network traffic separate while sharing the same physical infrastructure. At the routing layer, we configured redundant 10-gigabit routers for failover so a second router can take over if the primary router goes offline.

A second fiber handoff to UTOPIA
The conference center also needed redundancy where the carrier hands off service to the building. Davis has two fiber uplinks to UTOPIA. 1GC managed the installation of one of those links so the venue could connect through a second handoff instead of depending on a single demarcation point.
Working with the venue beyond the installation
We worked directly with Davis Conference Center staff to address questions and resolve issues that came up during the changeover. The work extended beyond connectivity: we also set up a new cloud server where the conference center could store its data.
For a venue planning a similar upgrade, the network closet is a useful place to start a site survey. The cable serving an access point, the uplink serving its closet, and the routers serving the building each play a different role when a conference fills the rooms.